PANOPTICON // SOP // PAN-SOP-0012
ALL SYSTEMS NOMINAL ·
SOP · STRAIN ENGINEERING

Strain Design & Containment-Trial Protocol

ActiveStrain EngineeringRev B
Doc Control PAN-SOP-0012 Revision B Effective 2091-01-18 Next Review 2092-01-18 Owner Strain Engineering Lead Approver Director of R&D Status Active Classification INTERNAL // QUANTUM-ZONE-TASK-FORCE EYES-ONLY

Purpose

To govern the design, construction, and containment-trial of engineered agents against a control spec, with a mandatory paired countermeasure before any agent leaves the design stage.

Scope

All gain-of-function strains, gene drives, and engineered agents in development.

In scope:

Design spec, construction, containment trial, characterization.

Out of scope:

Stockpile control (PAN-SOP-0008); vault access (PAN-SOP-0005).

Definitions

Control spec
The transmissibility, lethality, latency, and evadability targets an agent is designed to.
Containment margin
The margin between an agent's controllability and uncontrolled escape.

Responsibilities

Strain Engineering Lead (Owner)
Owns the design spec and the countermeasure-pairing gate.
Bioengineer
Constructs and characterizes the agent under containment.
Director of R&D
Approves the design and the containment trial.

Procedure

Design & construct

  1. Specify the control spec and the paired countermeasure.
  2. Construct under containment from cryo-bank substrate.
  3. Verify sequence and function.

Trial & characterize

  1. Run the containment trial in the BSL-4 Vault.
  2. Score against transmissibility, lethality, evadability, margin.
  3. Stockpile only with the countermeasure filed.

PPE & Controls

Containment suitSealed lab workspace

Records Generated

References

Revision History

RevDateNote
A2090-12-15Initial issue.
B2091-01-18Made countermeasure pairing a hard gate.
← Back to SOP Library